Client: |
East Orange Water Department |
Projects: |
Exploration; Resource
Assessment; Test Well Drilling;
..and Aquifer Pumping Tests; Permitting
|
Location: |
East Orange, New Jersey
|
|

The firm is contracted to the East Orange Water Department
for projects involving groundwater exploration, test and production
well drilling program management, water allocation permitting,
well efficiency testing, historical water quality overview,
and strategic planning. The East Orange Water Department derives
its’ supply from 4 wellfields constructed in the East Orange
Water Reserve which is 2,300 acres in area. These wellfields
supply 10 million gallons per day to the City.
Principal Projects:
- The running of aquifer pumping tests on
new production wells to evaluate aquifer hydraulic
characteristics and degree of well interference.
- Installation of two test wells; design
and conduct of aquifer pumping tests; and preparation of
permit-related technical reports and impact assessment for
allocation permit modification.
- Production well design and preparation
of bid contract documents.
- Evaluation of production well conditions
through well efficiency testing and the development of recommendations
for wells to be replaced, redeveloped, or relocated.
- Evaluation of water quality conditions
and changes over a 4-decade period. The development
of recommendations for groundwater quality protection through
land use controls and the development of a surface and groundwater
monitoring program.
Download
pdf of New Jersey Flows |
|
Client:
|
Montville
Township Water & Sewer Department |
Projects: |
Exploration
and Resource Assessment;
Aquifer Management
..Evaluation; Litigation Support;
Well Efficiency Testing |
Location: |
Montville,
New Jersey |
|
UBR is contracted to the Montville Township Water & Sewer
Department for various projects involving groundwater exploration;
test well program design and management, aquifer and regional
sustainability assessment and wellhead protection program development
and planning. The Township is characterized by areas underlain
by bedrock and buried valley glacial aquifer systems. The
Towaco Valley Glacial Aquifer is the sole source of drinking
water supply to the Township.
Principal Projects:
- Assessment of optimal areas for new production
wells within the Towaco Valley Aquifer using surface geophysical
exploration techniques.
- Evaluation of groundwater development
feasibility in the Montville Buried Valley Aquifer System
along the Rockaway River Valley. An analysis was made of
aquifer recharge, sustainability, and storage potential as
well as development feasibility over selected portions of
this system.
- Assessment of aquifer recharge to the
Towaco Valley Aquifer including an analysis of groundwater/surface
water interaction and development sustainability.
- Development of a wellhead protection
program and ordinance for the Towaco Valley Aquifer.
- Assessment of production well efficiencies
through a step-drawdown testing program and an evaluation
of the effectiveness of a well redevelopment program.
- Evaluation of groundwater quality trends
with respect to total dissolved solids, hardness, sodium
and chloride
|
|
Client: |
Hoechst Celanese Corporation
|
Projects: |
Hydrogeologic Studies and
Application for Groundwater
. Allocation Permit |
Location: |
Hoechst Celanese Facility,
Bridgewater, New Jersey
|
| |
UBR was contracted by Hoechst Celanese to obtain a groundwater
allocation permit for the facility which is a combination headquarters
and manufacturing location. Groundwater is used for cooling
water as well as process needs and is derived from a bedrock
aquifer system. The permit was granted to Hoechst Celanese
for a withdrawal of 0.5 Million Gallons per Day.
Principal Technical Elements:
- Test and production wells were installed
to supply cooling and process water for the facility.
- A controlled aquifer pumping test
was run and evaluated to develop an impact assessment
for the proposed groundwater allocation. The NJDEP used
this pumping test as a training element for some of its
new employees.
- A technical hydrogeologic report was
prepared in support of the groundwater allocation permit
application.

|
|
Client: |
Boonton Water
Department |
Projects: |
Exploration Test Well Drilling;
Production Well Design and
. Installation Supervision; Aquifer
Pumping Tests |
Location: |
Boonton, New Jersey
|
| |
The Firm is contracted to the Boonton Water
Department to provide services for groundwater exploration,
management and production well design and drilling program
management.
Principal Projects:
- Production well programs involving preparation of bidding
documents; well design; drilling and installation supervision;
and the running of aquifer pumping tests on the installed
production wells to evaluate aquifer hydraulic characteristics,
sustained well yields, and degree of well interference.
- Test well drilling programs to
assess optimal areas for replacement production wells;
design and conduct of aquifer pumping tests; and preparation
of permit-related technical reports and impact assessment
for allocation permit modification.
|
|
Client: |
Morris County Municipal
Utilities Authority
|
Projects: |
Production Well Design and
Installation Supervision;
. Aquifer PumpingTests;
Land Use Assessment in the MUA’s
. Wellfield Watershed;
Scrub Oaks Mine Storage Feasibility Study |
Location: |
Morris County, New Jersey
|
| |

The Firm provides hydrogeologic services for groundwater exploration,
management and well facility design and installation to the MUA.
Principal Projects:
- Evaluation of the feasibility of using
an iron ore mine for the storage of water derived from high
flow surface water skimming (using horizontal collector wells)
to meet peaking water needs particularly in summer months. The
project involved the drilling of a 1,000 foot well into the
mine; a 14-day pumping test at 3 mgd to assess interconnection
of mine workings and potential for impacts to surrounding
groundwater users; and an evaluation of the feasibility of
utilizing horizontal collector wells for capturing high flows
in a nearby river system.
- Assessment of production well efficiency
(pump and well) and the design of a replacement pump system
to avail of unused yield in one of the MUA’s principal production
wells.
- Design boring to assist in a replacement production well
for a well that pumped sand and had been improperly designed.
- Permit application process with the
NJDEP-BWA for installation and commissioning of a replacement
production well.
- Evaluation of a major proposed development
project within the MUA’s wellfield watershed and development
of an assessment of potential for impacts (short and long-term)
to the MUA’s production wells.
- Redevelopment of the utilities main production well
to restore well yield and reduce tubridity.

|
|
Clients: |
Washington Township
Municipal Utilities Authority and
. Cliffside Park Community
Water System |
Projects: |
Assessment of
VLF Survey, Geologic Structure and Lineament
. Analysis in
Precambrian Bedrock Terrain; Preparation of
. Permit-Related
Technical Reports for NJDEP-BWA Water
. Allocation Permit Modification |
Location: |
Schooley Mountain
and Long Valley, New Jersey |
| |
The
firm was contracted by the Washington Township Municipal Utilities
Authority to provide hydrogeologic consulting services for
groundwater exploration, and production well permitting. Click
on map for larger image.
Principal Projects:
- Evaluation of aerial photography and
Satellite Imagery for an analysis of bedrock fracture traces
and lineaments, and correlation of the identified features
with existing surface geophysical results from a Very Low
Frequency (VLF) survey and published geologic structure. Study
objectives were the development of additional groundwater
resources within a crystalline bedrock terrain.
- Evaluation of test production well
aquifer testing results; aquifer hydraulic characteristics,
sustained yield, impact assessment and preparation of required
hydrogeologic report for a NJDEP-BWA water allocation permit
modification for additional resource allocation.
- Evaluated existing well information,
and coordinated the utilization of a vertical electrical
sounding (VES) survey to identify a target fractured aquifer
zone. Evaluated data and designed a replacement well for
the community to optimize yield.
|
|
Client: |
Montclair Water
Bureau |
Projects: |
Aquifer Pumping
Test, Evaluation of Aquifer Hydraulic Parameters,
. Sustained
Yield Analysis, Preparation of Hydrogeologic Reports
. for
NJDEP-BWA Water Allocation Permit Modification
|
Location: |
Montclair Township,
New Jersey |
| |
The firm was contracted by the Montville Township Water Bureau
to provide hydrogeologic consulting services for aquifer test
and analysis of a 1.4 million gallon per day (mgd) production
well and related regulatory permitting activities.
Principal Projects:
Conducted a hydrogeologic characterization
of the Passaic Aquifer system for a New Jersey Water Allocation
Permit Application. Aquifer characterization activities
included installation of groundwater observation wells, conductance
of a 72-hour aquifer pumping test, data collection, analysis,
interpretation and preparation a hydrogeologic assessment report
in support of a water allocation application.
|
| Top |
|